
064633
Page 14
The following procedure and illustration describe how to lift the screed.
• Attach the U-shaped lifting bracket and associated hardware to the top of each truss frame section as shown in the
illustration below. Tighten bracket securely so that it will not slip.
• Utilize a spreader bar of proper length and lifting capacity. Secure lifting straps from both ends of the
spreader bar to the attached lifting brackets.
• Connect lifting cables from the spreader bar to the lifting hook of a crane or forklift. Ensure that the lifting hook and
chain are of appropriate lifting capacity.
•
Use crane or forklift to hoist screed onto a flatbed truck for transporting or onto the form for screeding.
Lifting Specifications
Содержание SE12
Страница 17: ...SECTION 1 SAFETY 064633 Page 17 SECTION 1 SAFETY ...
Страница 18: ...SECTION 1 SAFETY 064633 Page 18 State Regulations Proposition 65 Warning ...
Страница 19: ...SECTION 1 SAFETY 064633 Page 19 Federal Regulation Respiratory Hazard ...
Страница 30: ...SECTION 1 SAFETY 064633 Page 30 Notes ...
Страница 31: ...SECTION 2 OPERATIONS 064633 Page 31 SECTION 2 OPERATIONS ...
Страница 41: ...SECTION 3 SERVICE 064633 Page 41 SECTION 3 SERVICE ...
Страница 45: ...SECTION 4 PARTS 064633 Page 45 SECTION 4 Parts ...
Страница 72: ...SECTION 4 PARTS 064633 Page 72 4 13 End Mount Engine Assembly Illustration ...