Rockwell Automation Publication 750-UM006C-EN-P - March 2022
195
Chapter
7
Periodic and Preventive Maintenance
This chapter provides information on how to perform preventive maintenance
on the PowerFlex® 755 On-Machine™ Drive and components that can affect the
life and operability of the drive.
Recommended Preventive
Maintenance
Rockwell Automation recognizes that following a defined maintenance
schedule delivers the maximum product availability. By strictly following the
maintenance schedule that is provided, you can expect the highest possible
uptime.
This annual preventive maintenance program includes the following primary
tasks:
• A visual inspection of all drive components
• General cleaning and maintenance
• Tightness checks on all power connections
• Tightness checks on all bottom-plate connectors
See Chapter 5-
and Chapter 6-
additional information on how to inspect and test the system.
The recommended maintenance tasks and schedule for a drive are contained in
Maintenance of Industrial Control Equipment
Codes Explanations section on page
contains an explanation of the codes
that are contained in the recommended maintenance tasks and schedule tables.
IMPORTANT
Duty cycle, load profile, temperature, altitude, incoming line conditions, and
other operating/environmental conditions greatly affect reliability of a drive.
Содержание The PowerFlex 755 On-Machine
Страница 1: ...User Manual Original Instructions PowerFlex 755 On Machine Drive Bulletin Number 26G...
Страница 208: ...208 Rockwell Automation Publication 750 UM006C EN P March 2022 Appendix B Startup Information Notes...
Страница 216: ...216 Rockwell Automation Publication 750 UM006C EN P March 2022 Index Notes...
Страница 217: ...Rockwell Automation Publication 750 UM006C EN P March 2022 217 PowerFlex 755 On Machine Drive User Manual...