
98
Rockwell Automation Publication 2100-IN012G-EN-P - August 2016
Chapter 8
Energizing the Equipment
7. After all of the disconnects have been closed, energize loads such as,
lighting circuits, motor starters, and contactors.
a. When power-factor correction capacitors are energized with the
motor windings and the start-up procedure requires that the
respective motors be jogged or inched, temporarily disconnect the
power factor correction capacitors.
For more information on power factor capacitors and MCC units,
refer to the Power Factor Correction Capacitors for Bulletin 2100
Motor Control Center Starter Units Application Techniques,
publication
.
b. Verify that any acceleration times are within application
specifications.
Excessive starting currents and acceleration times can cause inverse time circuit
breakers, power fuses, overload relays, and other components to overheat and
shut down the equipment.
Содержание CENTERLINE 2100
Страница 4: ...4 Rockwell Automation Publication 2100 IN012G EN P August 2016 Summary of Changes Notes ...
Страница 106: ...106 Rockwell Automation Publication 2100 IN012G EN P August 2016 Chapter 10 Maintenance after Fault Condition Notes ...
Страница 108: ...108 Rockwell Automation Publication 2100 IN012G EN P August 2016 Chapter 11 Renewal Parts Notes ...
Страница 134: ...134 Rockwell Automation Publication 2100 IN012G EN P August 2016 Index Notes ...
Страница 135: ......