
Rockwell Automation Publication 2100-IN012G-EN-P - August 2016
79
Chapter
7
Final Checklist Before Energizing
Introduction
This section provides guidance for the startup of a newly installed MCC.
We recommend making an itemized list including the following:
• Serial number
• Number of sections
• Number of units and their corresponding voltage
• Current ratings
• Horsepower ratings
• Types of circuits
• Fuse sizes
• Circuit breaker ratings and trip settings
• Heater elements requirements
• Arc resistant components
• Other important data
The itemized list could be modeled after the MCC layout drawings supplied
with each MCC. Save this itemized list in a file along with other data for the
MCC such as, component manuals, heater element instructions, MCC
manuals, and wiring diagrams. Blank sample forms are provided at the end of
this chapter.
Pre-energizing Check
Procedure
Allow only a ‘qualified person’ to conduct the pre-energizing check. A
qualified person is defined by NEMA Standards Publication / No. ICS 2.3,
Instructions for the Handling, Installation, Operation and Maintenance of
Motor Control Centers, Section 1 as follows:
1.4 Qualified Person
For the purpose of this guide, a qualified person is one who is familiar
with the installation, construction and operation of the equipment and
the hazards involved. In addition, he or she has the following
qualifications:
1.4.1 Is trained and authorized to energize, de-energize, clear, ground
and tag circuits and equipment in accordance with established safety
practices.
Содержание CENTERLINE 2100
Страница 4: ...4 Rockwell Automation Publication 2100 IN012G EN P August 2016 Summary of Changes Notes ...
Страница 106: ...106 Rockwell Automation Publication 2100 IN012G EN P August 2016 Chapter 10 Maintenance after Fault Condition Notes ...
Страница 108: ...108 Rockwell Automation Publication 2100 IN012G EN P August 2016 Chapter 11 Renewal Parts Notes ...
Страница 134: ...134 Rockwell Automation Publication 2100 IN012G EN P August 2016 Index Notes ...
Страница 135: ......