
122
Rockwell Automation Publication 2100-IN012G-EN-P - August 2016
Appendix A
Bulletin 140G Unit Assembly Instructions
5. Install the bale on to the circuit breaker base.
The bale snaps into place on both sides of the circuit breaker base. (If the
bale does not snap in easily, check the orientation of the bale.)
6. Attach the line-side wiring and tighten to 53 lb•in (6 N•m) for G and H
frame units; tighten to 71 lb•in (8 N•m) for J Frame units.
7. Add the line terminal cover to the line side (not included in the kit).
8. Insert the terminal cover screw and washer (not provided with the kit),
and tighten to 8 lb•in (0.90 N•m).
9. Attach the load-side wiring and tighten to 53 lb•in (6 N•m) for G and
H frame units; tighten to 71 lb•in (8 N•m) for J frame units.
10. Install the load-side phase separators on the load side (not supplied with
the kit).
Verify that the phase separators are pushed down completely so that they
are flush with the cover.
IMPORTANT
The circuit breaker must be in the ‘ON’ position to install the bale.
Base
bale
Handle Linkage
Stud
Notch in bale
Содержание CENTERLINE 2100
Страница 4: ...4 Rockwell Automation Publication 2100 IN012G EN P August 2016 Summary of Changes Notes ...
Страница 106: ...106 Rockwell Automation Publication 2100 IN012G EN P August 2016 Chapter 10 Maintenance after Fault Condition Notes ...
Страница 108: ...108 Rockwell Automation Publication 2100 IN012G EN P August 2016 Chapter 11 Renewal Parts Notes ...
Страница 134: ...134 Rockwell Automation Publication 2100 IN012G EN P August 2016 Index Notes ...
Страница 135: ......