FAS-SLIDECH300BBUP SLIDING GATE OPERATOR
6
Chain
Close the gate and attach a chain bolt to the piece of chain that comes with the chain box using enclosure
master links. Tighten the chain bolt to the bracket with washers and nuts. Pull the chain through the
chain wheel box to the other chain bracket at the opposite end of the gate. Connect the other end of the
chain and the chain bolt, and then tighten the chain bolt to the chain bracket. Thread up the chain by
adjusting the chain bolt. Cut the chain to length if necessary. Make sure that the chain is perfectly
aligned with the chain holes on the chain box. Tighten the chain by tightening the chain bolts at either
end. See illustration below.
Chain bolt
Master link
Chain
Fig.5
Gate preparation
Be sure the gate is properly installed and slides smoothly before installing the FAS-SLIDECH300BBUP
sliding gate operator. The gate must be plumb, level, and move freely.
Conduit
In order to protect the wires, use PVC conduit for low voltage power cable and control wires. Conduit
must be preset into the concrete when it is poured. Wires within the conduit shall be located or protected
so that no damage can result from contact with any rough or sharp part.
Concrete pad
The base unit of the gate operator requires a concrete pad in order to maintain proper stability. The
concrete pad should be approximately 400mm x 250mm x 200mm deep in order to provide for adequate
weight and structure to insure proper stable installation.
Anchors (see Fig.2)
You can use anchor bolts, anchors, washers and nuts. These anchors must be set into the concrete when
it is poured or you can use wedge anchors to fasten the operator.
5. Adjustment
Manual operation
In case of power failure use manual release key to open or close gate manually, use the release key as
follow:
Fit the supplied key in the hole.
Turn the key
clockwise
to release the clutch.
Open and close the gate manually.