Introduction
Algas-SDI Operations & Maintenance Manual – P/N – 54264
1-7
Figure 5 - Single Venturi Control Box
Single Venturi Control Box.wmf
1. Start switch & boot
7. Terminal strip
2. Stop switch & boot
8. Explosion proof enclosure
3. Mixed gas pressure control switch
9. Flame arrestor (2 places)
(Venturi pressure controls switch)
10. Bulkhead Connector (2 places)
11. Fuse & Fuse Holder
4. Safety relay
12. Ground Anchors
5. Ground lug
13. Corrosion Inhibitor Tape
6. High mixed gas pressure safety switch
NOTE
The flame arrestor is a porous metal insert between the gas
line and the instrument. See the maintenance section for the
cleaning schedule.
Содержание VAPORAIRE M-Series
Страница 8: ......
Страница 18: ...Introduction 1 10 Algas SDI Operations Maintenance Manual P N 54264 Figure 7 SEQUENCER Diagram...
Страница 20: ...1 12 Algas SDI Operations Maintenance Manual P N 54264 This page intentionally left blank...
Страница 28: ...Startup 3 20 Algas SDI Operations Maintenance Manual P N 54264 This page intentionally left blank...
Страница 44: ...Operation 4 36 Algas SDI Operations Maintenance Manual P N 54264 This page intentionally left blank...
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ...OPTIONS...
Страница 66: ...This page intentionally left blank...
Страница 68: ......
Страница 69: ...APPENDIX A COMPONENT INFORMATION...
Страница 70: ...This page left intentionally blank...
Страница 71: ......