background image

 

 

 

 

WARNING 

 

Read the OPERATION MANUAL before operating this equipment. 

DISCLAIMER  

Algas-SDI International, LLC (ASDI) shall not be liable for technical 
and/or editorial errors or omissions in this manual.  ASDI makes no 
warranties, express or implied, including the implied warranties of 
merchantability and fitness for a particular purpose with respect to 
this manual.  In no event shall ASDI be liable for any special or 
consequential damages including, but not limited to loss of 
production time, or loss of profits. 

   NOTE:   Algas-SDI reserves the right to use alternate manufacturers’ 

components as vendor delivery applicability dictates.  Vendors 
have supplied literature contained in the Operation Manual.  
Please check to be sure supplied data matches your 
configuration.  Contact Algas-SDI if any questions exist. 

   This equipment uses LPG-a flammable fuel, or NH3-a toxic gas, 

(depending on the model), handled under pressure.  Inherent hazards 
exist, and a thorough understanding of the equipment is required to 
allow safe operation and maintenance. 

   Allow only a TRAINED and FULLY QUALIFIED PERSON to service this 

equipment. 

   Any time a component must be replaced, use the same type, model, etc.  

DO NOT SUBSTITUTE!  The consequences from such actions are 
unpredictable and may lead to dire consequences.  When components 
are replaced with components not approved for use in our FM/CSA 
listed equipment, the FM/CSA listing becomes void for that unit. 

 

Содержание VAPORAIRE M-Series

Страница 1: ...nce Manual 151 S Michigan Street Seattle Washington USA 98108 Tel 206 789 5410 Fax 206 789 5414 Web www algas sdi com MANUAL PN 54264 VAPORAIRE REV 08 26 19 Digitally signed by Ana Torres Date 2019 08...

Страница 2: ...ability dictates Vendors have supplied literature contained in the Operation Manual Please check to be sure supplied data matches your configuration Contact Algas SDI if any questions exist This equip...

Страница 3: ...erformed by others upon or in conjunction with ASDI equipment unless prior authorization is given by means of an Algas SDI International LLC purchase order Algas SDI International LLC will not be liab...

Страница 4: ...E GAS HAZARD This Symbol indicates a potential hazard which can result in severe personal injury or death Use extreme care and follow the instructions given ELECTRICAL DISCONNECT REQUIRED This symbol...

Страница 5: ...r Tank Sizing 2 18 Table 4 Surge Accumulator Tank Requirements 2 18 3 Startup 3 19 4 Operation 4 21 SINGLE VENTURI SYSTEMS 4 22 Mixer Operation 4 22 Mixed Gas Operating Pressure Adjustments 4 22 High...

Страница 6: ...44 MAINTENANCE FOR ALL SINGLE MIXERS USING A PRESSURE SWITCH FOR CONROL 5 45 MAINTENANCE FOR ALL MIXERS USING THE SEQUENCER 5 45 SEQUENCER 5 46 Replacing TRIMPOT6 C and Analog Input Module D 5 46 Figu...

Страница 7: ...formation Figure 15 Inlet Solenoid Assembly Diagram Solenoid Noise Component Specifications Warranty Registration Refer to the Nameplate on the unit to fill out the product registration Then photocopy...

Страница 8: ......

Страница 9: ...ed in the surge accumulator tank to provide uninterrupted flow of mixed gas from full flow to no flow automatically All models are explosion proof and meet the requirements of Class I Division 1 Group...

Страница 10: ...APORAIRE Mixer Figure 1 Mixed gas is produced by the venturi assembly 5 LPG vapor enters the vapor manifold and passes through the safety inlet solenoid valve 1 A High Mixed Gas Pressure Switch in the...

Страница 11: ...anual shut off valve 3 Venturi vapor solenoid valve 13 Venturi motive pressure gauge 4 Venturi vapor pressure regulator 14 Low vapor pressure switch 5 Venturi assembly 15 Secondary check valve optiona...

Страница 12: ...Introduction 1 4 Algas SDI Operations Maintenance Manual P N 54264 Figure 2 VAPORAIRE with surge accumulator tank configuration Venturi Mixing Sys wmf...

Страница 13: ...2 Nozzle 3 Air inlet screen assembly 4 Venturi motive pressure gauge 5 Venturi assembly 6 Venturi vapor solenoid valve 7 Venturi manual shut off valve 8 Vapor inlet header 9 Low vapor pressure switch...

Страница 14: ...Introduction 1 6 Algas SDI Operations Maintenance Manual P N 54264 Figure 4 VAPORAIRE M Series Configuration VAPORAIRE M Series Mixing Sys wmf...

Страница 15: ...closure 3 Mixed gas pressure control switch 9 Flame arrestor 2 places Venturi pressure controls switch 10 Bulkhead Connector 2 places 11 Fuse Fuse Holder 4 Safety relay 12 Ground Anchors 5 Ground lug...

Страница 16: ...Introduction 1 8 Algas SDI Operations Maintenance Manual P N 54264 Figure 6 8100 Sequencer Control Box 8100 Seq Control Box wmf...

Страница 17: ...ressure control switch venturi pressure control switch 6 High mixed gas pressure safety switch 7 Terminal strip 8 Thermostat 1 temperature control 9 Thermostat 2 over temperature control 10 Interposin...

Страница 18: ...Introduction 1 10 Algas SDI Operations Maintenance Manual P N 54264 Figure 7 SEQUENCER Diagram...

Страница 19: ...gas pressure CH1 Alarm Delay Timer adjustment 0 10 minutes for Optional Alarm 1 CH2 Not used CH4 Not used CH5 Not used CAUTION Adjustments are one turn stop to stop Do not force them They can easily...

Страница 20: ...1 12 Algas SDI Operations Maintenance Manual P N 54264 This page intentionally left blank...

Страница 21: ...In mixers using the SEQUENCER the software program for controlling the blending operation is set at the factory Any attempt to change the software voids the operating warranty Installation requiremen...

Страница 22: ...Installation 2 14 Algas SDI Operations Maintenance Manual P N 54264 Figure 10 Typical VAPORAIRE Installation Drawing VAPORAIRE Installation dxf...

Страница 23: ...Installation Algas SDI Operations Maintenance Manual P N 54264 2 15 Figure 11 Typical VAPORAIRE M Series Installation Drawing VAPORAIRE M Series Installation wmf...

Страница 24: ...be available to the control box mounted on the mixing system Refer to the Data Sheet for electrical service requirements All wiring should be in accordance with NFPA 70 suitable for the proper area cl...

Страница 25: ...ort 3 Connect the mixed gas outlet of the unit to the surge accumulator opening The tank inlet connection interconnecting spool must be the same diameter as the mixed gas outlet and no longer than ten...

Страница 26: ...LLONS 125 150 All 15 PSI models require a surge accumulator tank of at least 500 gallons capacity 1 Capacity is based on a nominal mixed gas gross heating value of 1450 BTU SCF with commercial grade p...

Страница 27: ...outlet valve on the surge accumulator tank 4 Open the venturi shutoff valves on each venturi train 5 Slowly open the main vaporizer outlet valve 6 Push the Start switch The vapor inlet solenoid valve...

Страница 28: ...Startup 3 20 Algas SDI Operations Maintenance Manual P N 54264 This page intentionally left blank...

Страница 29: ...LPG vapors in the area when the control box cover is removed If the cover must be removed shut off the power remove the cover and check very carefully for LPG fumes leaks or any indication of LPG in...

Страница 30: ...NTS The Mixed Gas Pressure Control Switch is also referred to as Venturi Control or System Delivery Pressure Switch The Mixed Gas Pressure Control Switch is wired normally closed and is set to open at...

Страница 31: ...e setting The High Mixed Gas Pressure Switch is set 3 PSI above the mixed gas operating pressure EXAMPLE 8 PSIG Mixed Gas Pressure 3 PSI 11 PSIG High Mixed Gas Pressure Setpoint LOW VAPOR PRESSURE SWI...

Страница 32: ...QUENCER opens the venturis progressively in sequence so they are all used equally They are controlled in a first on first off rotation For example if five venturis are used and the load requires two v...

Страница 33: ...s will be lit POWER STATUS RUN STATUS INPUT STATUS will only be on if the input is active OUTPUT STATUS will only be on if the output is active The mode switch must always be in the up RUN position AN...

Страница 34: ...for the SEQUENCER and is labeled with the program version The Memory module is in the first slot on the top left On power up faults are cleared if any then the program is loaded NOTE The software prog...

Страница 35: ...1 Discrete Inputs Discrete Inputs of Venturi Solenoids I 03 I 04 I 05 I 06 0 0 0 1 1 0 0 1 0 2 0 0 1 1 3 0 1 0 0 4 0 1 0 1 5 0 1 1 0 6 0 1 1 1 7 1 0 0 0 8 All other combinations 1 0 Input not jumped t...

Страница 36: ...operating temperature put a load or flare stack on the system so at least one venturi is cycling Note the number of venturis that are not cycling Note the high and low cycling pressure in the surge ac...

Страница 37: ...to data sheet for setpoint Control box must be open to adjust 1 To set turn the adjusting wheel to the approximate setting shown on the indicator scale on the switch indicator on the front of the swit...

Страница 38: ...es The Mixed Gas Operating Pressure Switch and Venturi Valve are not allowed to operate until the there is adequate vapor pressure to operate the venturi 1 Put the system on a load so that the single...

Страница 39: ...r where it decelerates and gains pressure as it fills the mixed gas surge accumulator tank The mixed gas is held in the surge accumulator tank at a pressure controlled by the SEQUENCER until withdrawn...

Страница 40: ...progressive control system that selects a different venturi every time a venturi operates A venturi must operate continually so it can be adjusted The progressive sequencing of venturis must be stopp...

Страница 41: ...s simultaneously 3 Close the shutoff valve on the pilot supply line to the pilot operator 4 Open the shutoff valve on one of the venturis The mixed pressure should increase to the setpoint and the ven...

Страница 42: ...demand on the vaporizer Increasing motive pressure beyond the setpoint should only be done when required with caution to avoid overdrawing the vaporizer and increasing the mixed gas HEATING VALUE CON...

Страница 43: ...t valve of the vaporizer 3 Push the START switch on the control box and observe that the mixed gas pressure rises to the setpoint 4 Open the surge accumulator tank outlet valve the system is then on l...

Страница 44: ...Operation 4 36 Algas SDI Operations Maintenance Manual P N 54264 This page intentionally left blank...

Страница 45: ...evis assembly clevis bolt nut valve arm valve surface Replace if worn Pressure Regulators Check setpoints Replace disk assembly Replace diaphragm if Required Control Box Electrical Components Open box...

Страница 46: ...with a soapy solution Replace the valve if there are any leaks Pressure Regulators Check setpoints Inspect disk assembly seat ring and diaphragm Replace if necessary Control Box Electrical Components...

Страница 47: ...is to be used for the Venturi Check Valve Kit P N 40490 Please refer to the following diagrams when removing and installing the Venturi Check Valve A Check Valve Assembly B Housing Lid C Housing Gaske...

Страница 48: ...head screws that secure the Housing Lid B to the Venturi Housing D This will require a 1 8 Allen wrench 9 With the Allen head screws removed separate the loosened pipe union from step 6 Apply some up...

Страница 49: ...s 3 Insert the Check Valve Arm K into the slot of the Clevis I and connect the two pieces with the clevis arm Pivot Screw L through the aligned holes Be sure that the flat washers are inserted on eith...

Страница 50: ...ion around the valve arm pivot lowering the Check Valve Arm K should cause only the upper part of the Check Valve M to contact the Seating Surface F c Lower the Check Valve Arm K a third time allowing...

Страница 51: ...e acorn nut 6 Tighten the Lock Nut J on the clevis arm Pivot Screw L until the arm is tight in the Clevis I Then slowly loosen the lock nut just until the arm can swing freely Check that the Check Val...

Страница 52: ...ng pressure shut off the system close the inlet valve and disconnect all power 3 Use either a gas detector or a soapy solution applied to the check valve and seat to determine if there is a leak 4 If...

Страница 53: ...the body d Replace the switch and connect per schematic e Close the explosion proof box f Turn on the power at the main feed disconnect g Adjust the system output pressures as described in Section 4 O...

Страница 54: ...o repair the sequencer modules If the module is defective the entire module should be replaced REPLACING TRIMPOT6 C AND ANALOG INPUT MODULE D Figure 14 Module Removal Installation Drawing 1 Turn off p...

Страница 55: ...l 54264 5 47 4 Position the replacement plug in module with the terminal block facing the front of the controller as shown 5 Snap the replacement module into the module bay 6 Using a screwdriver tight...

Страница 56: ...ontrol panel and is not visible The heater is controlled by two thermostats One thermostat 1 is mounted on the stop switch and the second thermostat 2 is mounted directly on the control panel The heat...

Страница 57: ...rd debris may cause piston style solenoid valves to stick or operate poorly and be the cause of fuses blowing frequently To check if a piston type valve is sticking rap the valve with a rubber mallet...

Страница 58: ...e Output status LED s to see which alarm shut the mixer down Table 3 Annunciator output for mixers having fewer than 7 venturis Discrete Output Associated Input Alarm Description Solid Blinking O 8 I...

Страница 59: ......

Страница 60: ......

Страница 61: ......

Страница 62: ......

Страница 63: ......

Страница 64: ......

Страница 65: ...OPTIONS...

Страница 66: ...This page intentionally left blank...

Страница 67: ...rge accumulator tank packages FLARE STACK Contact Algas SDI international for Flare Stack Packages SECONDARY AIR CHECK VALVE ASSEMBLY Secondary Air Check Valve Assembly ASDI PN 20120 See Drawing 1302...

Страница 68: ......

Страница 69: ...APPENDIX A COMPONENT INFORMATION...

Страница 70: ...This page left intentionally blank...

Страница 71: ......

Страница 72: ...Algas SDI International LLC 151 S Michigan Street Seattle Washington 98108 USA Ph 1 206 789 5410 Fax 1 206 789 5414 www algas sdi com...

Отзывы: