
16
Figure 5
Slot the wires through the wire passage and start wiring.
It is extremely important for the end of the wire of the load cell which is not covered by a
sheath to be as short as possible
After completing the wiring, insert the card
Lastly, insert the terminal block units, paying attention to the direction.
Make sure that cables are not squashed on the bottom of the instrument.
After completing the wiring it is possible to supply power to the instrument, switching it on using
the switch on the back and proceeding as follows:
•
Configure the instrument.
•
Check the operation of the inputs and outputs, using the controls of the
DIAGNOSIS
menu.
•
Calibrate the transducers.
Содержание CSQ-Visual
Страница 1: ...Mar 7 2017 CSQ Visual Version with VIO9 card Installation manual...
Страница 2: ...2...