CONTACT CSI FOR MORE INFORMATION | CSIDESIGNS.COM | [email protected] | 417.831.1411
3 Installation
Read the instructions carefully. The valve is supplied as separate parts to facilitate welding.
LKB: for ISO tubes.
LKB-2: for DIN tubes.
LKB-F: with flange connection.
3.3 Welding
S
Stteepp 11
LLK
KB
B//LLK
KB
B--22
1. Weld the valve body halves into the pipelines.
2. Maintain the minimum clearance (A) so that the actuator can be removed.
3. If welding both valve body halves, ensure that they can be moved axially B
B11 m
mm
m, so that the valve parts can be removed.
4. After welding, assemble the valve according to steps 1-5, chapter 5.3 Assembly of valve - LKB/LKB-2/LKB-LP
LLK
KB
B--FF
1. Weld the flanges into the pipelines.
2. Maintain the minimum clearances (A and B2) so that the actuator and the valve parts can be removed.
3. After welding, assemble the valve according to steps 1-5, chapter 5.3 Assembly of valve - LKB/LKB-2/LKB-LP
P
Prree--uussee cchheecckk -- LLK
KB
B//LLK
KB
B--22//LLK
KB
B--FF
Open and close the valve several times to ensure that the valve disc moves smoothly against the seal ring.
P
Paayy ssppeecciiaall aatttteennttiioonn ttoo tthhee w
waarrnniinnggss!!
LLK
KB
B
LLK
KB
B--FF
TD 403-088
A
B
1
B
A
2
TD432-002_1
C
Caauuttiioonn!!
A
A
((m
mm
m))
Ø
Ø8855
Ø
Ø113333
S
Siizzee
LLK
KLLA
A
LLK
KLLA
A--TT
LLK
KLLA
A
LLK
KLLA
A--TT
B
B
11
((m
mm
m))
B
B
22
((m
mm
m))
1”
245
20
43
1½”
245
20
43
2”
255
20
47
2½”
265
24
46
3”
265
24
59
4”
290
420
37
59
DN25
245
20
43
DN32
245
20
43
DN40
250
20
43
DN50
260
20
47
DN65
270
24
59
DN80
275
27
59
DN100
290
420
27
59
DN125
315
440
30
63
DN250
325
+ 172
(incl. top unit)
445
+ 172
(incl. top unit)
41
79
11