OmniSwitch 6350 Hardware Users Guide
April 2017
page 2-1
2 Getting Started
Installing the Hardware
Items Required
•
Grounding wrist strap
•
Phillips screwdriver
•
Flat-blade screwdriver
Site Preparation
Environmental Requirements
OmniSwitch 6350 switches have the following environmental and airflow requirements:
•
The installation site must maintain a temperature between 0° and 45° Celsius (32° and 113° Fahrenheit)
and not exceed 95 percent maximum humidity (non-condensing) at any time.
•
Be sure to allow adequate room for proper air ventilation at the front, back, and sides of the switch.
Refer to
“Airflow Considerations” on page 2-5
for minimum clearance requirements. No clearance is
necessary at the top or bottom of the chassis.
Electrical Requirements
Note.
Alcatel-Lucent switches must be installed by a professional installer. It is the responsibility of the
installer to ensure that proper grounding is available and that the installation meets applicable local and
national electrical codes.
Содержание OmniSwitch 6350
Страница 1: ...Part No 060406 10 Rev E April 2017 OmniSwitch 6350 Hardware Users Guide enterprise alcatel lucent com...
Страница 30: ...Your First Login Session Getting Started page 2 12 OmniSwitch 6350 Hardware Users Guide April 2017...
Страница 122: ...Monitoring the Stack Managing OmniSwitch 6350 Stacks page 7 42 OmniSwitch 6350 Hardware Users Guide April 2017...