
...................................................................................................................................................................................................
3
If
then
floor stand
is not
available on site
Tape over the open holes to prevent debris
from falling inside.
Do not install the anchors at this time. Anchors
will be installed later by equipment installers.
Procedure ends here.
floor stand
is
available on site
Continue with next step.
...................................................................................................................................................................................................
4
Center floor stand over the drilled anchor holes.
...................................................................................................................................................................................................
5
Set and torque the anchor bolts.
Basic site preparation requirements and footprints for
RRHs
Site requirements for RRHs
Site requirements for floor stand installations
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
9927 Dist BTS Outdoor
401-703-516
Issue 1
March 2012
Alcatel-Lucent – Proprietary
Use pursuant to applicable agreements
6-19
E
N D
O F
S T E P S
...................................................................................................................................................................................................