Local testing and operating sequence
Tests and Measurements
............................................................................................................................................................................................................................................................
PN 8DG08136CAAA
Issue 1 March 2008
3-39
............................................................................................................................................................................................................................................................
Figure 3-8 Commissioning example
For the local test optimization the two operators have to move along the link nodes route,
as in the following example:
•
They must be able to perform the local tests on all nodes;
•
They must be able to perform the single span attenuation respecting the design project
document;
•
They must be able to perform the link tests.
Looking at the example link shown in
Figure 3-8
, the commissioning steps examples are
described in the following:
........................................................................................................................................................................................................................
1
The operator A performs the local tests on the Terminal-A.
The operator B performs the local tests on ROADM/ILA-A/B.
The operators jointly perform the span I attenuation test.
........................................................................................................................................................................................................................
2
The operators perform the same operations carried out in STEP 1, on Terminal-B, and
SPAN II.
........................................................................................................................................................
E
N D
O
F
S
T E P S
At the end of link tests it is necessary to come back on all nodes for all the link test
presettings removal, if performed, and restore all the node settings according to initial
configuration.
The available DWDM circuits packs are listed in
Table 3-6, “SONET/SONET, data, and
WDM cards connection points” (p. 3-6)
.
DWDM Commissioning Overview
The kinds of nodes that can be present in a link are the following:
•
ROADM
•
ILA
•
UILA
Terminal
A
ROADM/ILA
Terminal
B
1
2
A
B
B
A
I
II
A/B
Содержание 1850 TSS-320
Страница 6: ... List of figures v i PN 8DG08136CAAA Issue 1 March 2008 ...
Страница 8: ... List of tables v i i i PN 8DG08136CAAA Issue 1 March 2008 ...
Страница 16: ... Safety rules Safety 1 4 PN 8DG08136CAAA Issue 1 March 2008 ...
Страница 124: ... Equipment acceptance sheet 1850 TSS 320 Test Report Sheet Modules 5 10 PN 8DG08136CAAA Issue 1 March 2008 ...
Страница 138: ... Other technical support services Technical Support A 14 PN 8DG08136CAAA Issue 1 March 2008 ...
Страница 140: ... Glossary GL 2 PN 8DG08136CAAA Issue 1 March 2008 ...