
v
PN 8DG08136CAAA
Issue 1 March 2008
............................................................................................................................................................................................................................................................
List of figures
2
Initial Turn-up and Provisioning
2-1
Hyperterm setup .......................................................................................................................... 2-7
2-2
OMD/OTS assignment ................................................................................................................. 2-9
3
Tests and Measurements
3-1
Common cards connection points position .................................................................................. 3-5
3-2
Free-running frequency check .................................................................................................... 3-10
3-3
Test on multi-demultiplexing and AIS for optical tributaries .................................................... 3-13
3-4
OC-36/OC-192 ports test ........................................................................................................... 3-17
3-5
Test of GbE transport on VC3-xV ............................................................................................. 3-22
3-6
Test of 10 GbE transport on VC4-xV ........................................................................................ 3-29
3-7
Q-Bridge VLAN switching test, untagged frames ..................................................................... 3-36
3-8
Commissioning example ............................................................................................................ 3-39
3-9
Line terminal configuration in DWDM systems ........................................................................ 3-40
3-10
ILA configuration in DWDM systems ....................................................................................... 3-41
3-11
Optical add/drop multiplexer (ROADM degree-2) in DWDM system ...................................... 3-42
3-12
Local test in line terminal configuration in DWDM systems .................................................... 3-42
3-13
Local test in OADM configuration in DWDM systems ............................................................. 3-45
3-14
Link test in DWDM system ....................................................................................................... 3-46
3-15
End-to-end stability test example in DWDM system ................................................................. 3-47
3-16
Matrix/CRU EPS protection check ............................................................................................ 3-49
3-17
Synchronism priority and holdover ............................................................................................ 3-50
3-18
Alarms check .............................................................................................................................. 3-53
3-19
Back panel electrical connectors location and pinout ................................................................ 3-57
3-20
Optical “line port” link margin .................................................................................................. 3-62
Содержание 1850 TSS-320
Страница 6: ... List of figures v i PN 8DG08136CAAA Issue 1 March 2008 ...
Страница 8: ... List of tables v i i i PN 8DG08136CAAA Issue 1 March 2008 ...
Страница 16: ... Safety rules Safety 1 4 PN 8DG08136CAAA Issue 1 March 2008 ...
Страница 124: ... Equipment acceptance sheet 1850 TSS 320 Test Report Sheet Modules 5 10 PN 8DG08136CAAA Issue 1 March 2008 ...
Страница 138: ... Other technical support services Technical Support A 14 PN 8DG08136CAAA Issue 1 March 2008 ...
Страница 140: ... Glossary GL 2 PN 8DG08136CAAA Issue 1 March 2008 ...