
............................................................................................................................................................................................................................................................
Local testing and operating sequence
Tests and Measurements
3-38
PN 8DG08136CAAA
Issue 1 March 2008
............................................................................................................................................................................................................................................................
........................................................................................................................................................................................................................
6
Connect the pattern generator/error detector and check that no errors are read
........................................................................................................................................................
E
N D
O
F
S
T E P S
DWDM ports test
Before starting the DWDM commissioning, be sure that the optical fibers are properly
cleaned.
All the single spans attenuation connecting the various link nodes, including the
acceptable margin, are given in the Design Project document (released by a Project
Manager) and in the Link Description Table (LDT).
The procedure is divided in two parts:
•
Local test
•
Link test
The node local test must be performed first. The link tests can be carried out after local
tests on all nodes.
Pattern generator / Error Detector setup
Port type
GbE
Auto-negotiation
ON
Frame length
1518 bytes
Bandwidth
100%
VLAN TAG
Value set via CT, i.e. 10
Optical interfaces (SFP) types
(refer to
Chapter 4
,
“SFP and XFP modules optical
characteristics” (p. 4-16)
for details)
GbE SFP interface types (on PIM1GE)
B&W = 1000 Base SX / 1000 Base LX / 1000 Base
ZX
CWDM = APD (C8L1-1D2) for long haul,
PIN (C8S1-1D2) for short haul
Содержание 1850 TSS-320
Страница 6: ... List of figures v i PN 8DG08136CAAA Issue 1 March 2008 ...
Страница 8: ... List of tables v i i i PN 8DG08136CAAA Issue 1 March 2008 ...
Страница 16: ... Safety rules Safety 1 4 PN 8DG08136CAAA Issue 1 March 2008 ...
Страница 124: ... Equipment acceptance sheet 1850 TSS 320 Test Report Sheet Modules 5 10 PN 8DG08136CAAA Issue 1 March 2008 ...
Страница 138: ... Other technical support services Technical Support A 14 PN 8DG08136CAAA Issue 1 March 2008 ...
Страница 140: ... Glossary GL 2 PN 8DG08136CAAA Issue 1 March 2008 ...