![AISWEI A10081-00 Скачать руководство пользователя страница 34](http://html.mh-extra.com/html/aiswei/a10081-00/a10081-00_manual_2880475034.webp)
AISWEI Cloud
~
34
~
Fig. 7-3: Enter the AiCom/AiCom WiFi and PV plant information
to finish the creation of PV plant
During PV plant creation, it is very important to choose the correct
time zone. Please select the correct time zone where the PV plant
is located in Position 4 shown in Fig. 7-3.
When establishing a PV plant, it is necessary to input the serial
number and registry number of the AiCom/AiCom WiFi. This
information can be found on the AiCom/AiCom WiFi label.
7.3
Browse PV plant
You can enter any PV plant by clicking the plant list. This allows you to view the
power generation data of the PV plant as well as inverter events. The menu structure
is shown in Fig. 7-4:
Plant Monitoring Page
Power &
Energy
Event
Input
Output
Co2 Avoided
& Income
Over View
Fig. 7-4: Menu structure of PV plant monitor page