background image

26

ICE CFA1012A I&O Manual 01/2021 New

Chapter 6  Warranty

6.1  Airxcel Commercial/Industrial Group Limited Product Warranty

Marvair Inc., warrants its products to be free from defects in materials and workmanship under normal use to the original purchaser 

for the period of time in the table below. If any part of your  product fails within 12 months from start-up, or 18 months from 

shipment from the factory,  whichever comes first, Marvair, Inc.  will furnish without charge, EXW Cordele, Georgia, the required 

replacement part. The owner must provide proof of the date of the original start-up. The contractor’s invoice, the certificate of 

occupancy, or similar documents are examples of acceptable proof of the date of the original start-up.

Marvair, ICE, Eubank Products

90 Days

1

 w/Flat Rate Labor

2

 (See Marvair, ICE, Eubank Flat Rate Labor Guidelines)

1 Year Parts

2,3

5 Years Compressor

2

1

If any part of your Marvair, Inc.  unit fails within 90 days of the commencement of the warranty, Marvair, Inc.  will furnish without charge, EX Works, Cordele, Georgia, the 

required replacement part and pay for the labor to replace the part in accordance with the Marvair, Inc. Flat Rate Labor Guidelines.

2

All OTR (over the road) applications that are moved from one location to another: Factory Warranty applies only up to the point of initial start-up and test at all OEM 

manufacturing locations or subsequent facility. Once it goes into OTR service, the warranty expires immediately for compressor and sealed system components. This OTR 

exemption does not apply to relocatable classrooms, construction or office trailers.

3

All warranty replacement parts shall be shipped Ground only. Expedited shipping is available upon request for additional cost.

The responsibility of the equipment owner includes:

1.  To operate the equipment in accordance with the manufacturer’s instructions.

2.  To provide easy accessibility for servicing.

3.  To check and reset any circuit breaker(s) and/or disconnect(s) prior to calling for service.

4.  To keep the unit clean and free of dirt and containment and replace filters as required.

5.  To keep the outdoor coil clean and free of leaves, paper, or other debris.

6.  To pay the charges incurred when any of the above have not been done.

7.  To pay for repair or replacement of any material or part other than those within the Marvair unit or controller.

Marvair, Inc.,  will not be responsible for labor after 90 days, transportation costs, delays or failures to complete repairs caused by 

events beyond our control (labor hours incurred due to required site-specific training, time waiting to gain access, or extended drive 

time for remote sites). This warranty does not cover:

1.  Any transportation, related service labor, diagnosis calls, filter, driers, refrigerant, or any other material charges.

2.  Damages caused by shipping, accident, abuse, negligence, misuse, fire, flood, or Acts of God.

3.  Damages caused by operating or staging the unit in a corrosive environment.

4.  Damages caused by improper application of the product.

5.  Damages caused by failing to perform proper routine maintenance.

6.  Expenses incurred for erecting, disconnecting or dismantling the product or installing the replacement part(s).

7.  Products not installed or operated according to the included instructions, local codes, and good trade practices.

8.  Products moved from the original installation site.

9.  Products lost or stolen

10.  Consequential damages or incidental expenses including losses to persons, property or business.

11.  Modifications  to  original  unit  after  it  leaves  the  factory,  such  as  breaking  into  any  part  of  the  sealed  systems  unless 

authorized in advance in writing by Marvair, Inc.. 

12.  Damages as a result of operating as a construction site cooler / dehumidifier.

When labor (first 90 days only)  is required, it must be performed during normal working hours (8:00 AM - 5:00 PM) Monday - Friday 

and must be performed by Marvair, Inc.,  personnel or a designated Service Representative. 
The owner of the product may ship the allegedly defective or malfunctioning product or part to Marvair, Inc.,, at such owner’s 

expense, and Marvair, Inc.,  will diagnose the defect and, if the defect is covered under this warranty, Marvair, Inc.,  will honor its 

warranty and furnish the required replacement part. All costs for shipment and risk of loss during shipment of the product to 

Marvair, Inc., and back to the owner shall be the responsibility and liability of the owner. Upon written request by an owner, Marvair, 

Inc., may arrange for remote diagnosis of the allegedly defective or malfunctioning product or part but all costs for transportation, 

lodging and related expenses with regard to such diagnostic services shall be the responsibility and liability of the owner.
An owner requesting performance under this Warranty shall provide reasonable access to the allegedly defective or malfunctioning 

product or part to Marvair, Inc., and its authorized agents and employees.
THIS WARRANTY CONSTITUTES THE EXCLUSIVE REMEDY OF ANY PURCHASER OF A MARVAIR HEAT PUMP OR AIR CONDITIONER 

AND IS IN LIEU OF ALL OTHER WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING, WITHOUT LIMITATION, ANY IMPLIED WARRANTY 

OF MERCHANTABILITY OR FITNESS FOR USE, TO THE FULLEST EXTENT PERMITTED BY LAW. IN NO EVENT SHALL ANY IMPLIED 

WARRANTY OF MERCHANTABILITY OR FITNESS FOR USE EXCEED THE TERMS OF THE APPLICABLE WARRANTY STATED ABOVE 

AND MARVAIR SHALL HAVE NO OTHER OBLIGATION OR LIABILITY. IN NO EVENT SHALL MARVAIR BE LIABLE FOR INCIDENTAL OR 

CONSEQUENTIAL DAMAGES OR MONETARY DAMAGES.
THIS WARRANTY GIVES YOU SPECIFIC LEGAL RIGHTS, AND YOU MAY ALSO HAVE OTHER RIGHTS WHICH VARY FROM STATE-TO-

STATE. Some states do not allow limitations or exclusions, so the above limitations and exclusions may not apply to you.  

  

Содержание Industrial Climate Engineering CFA1012A

Страница 1: ...oded View Parts List 26 Installation Operation Manual Vertical Air Conditioners Model CFA1012A Manufactured By Industrial Climate Engineering Division of AIRXCEL Inc P O Box 5104 Cordele Georgia 31010...

Страница 2: ...UNIT UPRIGHT Laying it down on its side may cause oil to leave the compressor and breakage or damage to other components 3 TURN ELECTRICAL POWER OFF AT THE breaker or fuse box BEFORE installing or wor...

Страница 3: ...thermostat END USER Retain these instructions for future reference Table of Contents Chapter 1 Air Conditioner Description Specifications 1 1 General Description 5 1 2 Model Identification 5 1 3 Seri...

Страница 4: ...e 3 Control Board Detail 11 Figure 4 Wall Mount Detail 15 Figure 5 Thermostat Wiring Diagram 17 Tables Table 1 Summary Ratings 6 Table 2 Electrical Characteristics 6 Table 3 Unit Load Amps 6 Table 4 A...

Страница 5: ...ing plate located on side panel Example C F A 1 0 1 2 A A 0 3 6 A 1 3 D A A 1 1 Position 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 Unit Designation Family C In...

Страница 6: ...ry Coil Model 00 05 10 15 20 25 CFA1012A 510 470 450 420 390 360 CFM Cubic Feet Minute Indoor Air Flow ESP External Static Pressure in Inches WG Note Follow local codes and standards when designing du...

Страница 7: ...3 4 197 mm 15 1 2 394 mm BACK OF UNIT ECUA12 SLIMPAC 1 1 2 38 mm 15 381 mm 1 5 8 41 mm 1 7 8 48 mm 1 7 8 48 mm 14 3 8 365 mm 57 7 8 1470 mm 11 3 4 298 mm 56 3 8 1432 mm 19 1 4 489 mm 2 3 8 60 mm 8 5...

Страница 8: ...s to liquid as heat is transferred to outdoor air drawn across the condenser by the condenser fan Liquid refrigerant is expanded into the evaporator through the metering device to repeat the cycle Coo...

Страница 9: ...9 ICE CFA1012A I O Manual 01 2021 New 1 6 Electrical Diagrams Figure 2 Typical Electrical Schematic...

Страница 10: ...gized Note There is no delay on break if the lockout condition is reset Delay on Make On initial power up only the unit will wait 0 03 to 10 minutes from the cooling Y call before al lowing the contac...

Страница 11: ...G the system must be manually reset once the lockout circuit is activated A manual reset is necessary to prevent harmful short cycling To reset switch turn primary power off then back on or turn therm...

Страница 12: ...p return the unit to the freight carrier 2 2 Installation Requirements General 1 Inspect unit for completeness Check for missing parts e g hardware Refer to the installation kit information in section...

Страница 13: ...package may include other factory supplied items optional as follows PART DESCRIPTION 50123 Digital thermostat 1 stage heat 1 stage cool 7 day programmable Fan switch Auto On Auto change over Keypad l...

Страница 14: ...sons could result in hazards to you and others Installation MUST conform with local codes or in the absence of local codes with codes of all governmental authorities have jurisdiction The information...

Страница 15: ...Use fabric boots to prevent the transmission of vibration through the duct system The fabric must be U L rated UL 181 to a minimum of 197 F 2 6 Bottom Bracket Installation Wall Openings Measure the di...

Страница 16: ...fore connecting line voltage Important All electrical work must meet the requirements of local codes and ordinances Work should be done only by qualified persons The CFA1012A units are provided with l...

Страница 17: ...17 ICE CFA1012A I O Manual 01 2021 New CFA1012A 20 A Figure 5 Thermostat Wiring Diagram...

Страница 18: ...________ Compressor Model No ______________________________________________ Serial No ______________________________________________ B Pre Start Up Is there any shipping damage Yes No If so where ____...

Страница 19: ...voltage ______________volts Voltage imbalance 100 x Max Deviation avg Voltage ___________ A voltage deviation greater than 2 with the unit running should be addressed and corrected Excess voltage devi...

Страница 20: ...________ Evap Leaving Air WB Temp ________ ________ Heater Contactor Amps L1 ________ ________ Heater Contactor Amps L2 ________ ________ Heater Contactor Amps L3 ________ ________ E Cooling Mode Chec...

Страница 21: ...3 ________ ________ Notes _________________________________________________________________________ _________________________________________________________________________ __________________________...

Страница 22: ...general problems followed by a compressor section Not every problem can be anticipated If you discover a problem that is not covered in this manual we would be very grateful if you would bring it to t...

Страница 23: ...oper connection in field wiring 3 Internal short circuit Loose or improper connection s in unit 4 Excessively high or low supply volt age or phase loss 3 only 1 Note electrical requirements in Chapter...

Страница 24: ...y be open You may have to wait several hours for it to reset 3 Motor Winding Resistances Using a digital volt ohm meter VOM measure the resistance across the compressor windings as shown below C S R R...

Страница 25: ...ot to wet any of the electrical components Be sure the unit has dried before restarting Condenser Periodicallyinspecttheoutdoorcondensercoilandthecabinetairreliefsfordirtorobstructions Remove foreign...

Страница 26: ...other material charges 2 Damages caused by shipping accident abuse negligence misuse fire flood or Acts of God 3 Damages caused by operating or staging the unit in a corrosive environment 4 Damages ca...

Отзывы: