11
GAS LIQUIDO/
LIQUID
R 60
MAXI
mm
R 20
MAXI
mm
90
°
90
°
1
50 ±5
70
±5
110 ± 5
60 ± 5
Ø GAS tube
Ø LIQUID tube
S
X 12 - 1
6
1/2"
1/4"
S
X 18 - 24
5/8"
3/8"
S
X
30
1
2
3
Press fully home
All 4 must support the part
INSTALLATION OF TUBING ON
WALL SUPPORT
-
The main advantage of your PXD product is
the possibility of locating the coolant tubing
on the wall support before installing the unit
(using the template supplied).
-
Place the tube locating template on the wall
support.
INSTALLATION OF TUBING ON
WALL SUPPORT
-
After choosing your coolant tubing input
location (right, left or rear), you can set up
your tubing. To do this, use the installation
template in order to form the tubes correctly
and thus facilitate connection.
Recess for
FLARE nuts
Location of tubing clamps
Press
Slide under bracket
SX
Split system for wall / ceiling mounting
MANUAL MENU
Содержание SX 12 RCC
Страница 2: ...SX Split system for wall ceiling mounting MANUAL MENU...
Страница 28: ...MANUAL MENU...
Страница 29: ...MANUAL MENU...
Страница 30: ...MANUAL MENU...
Страница 31: ...MANUAL MENU...
Страница 32: ...MANUAL MENU...