4. Operation
4
-
3
4.2.2 Three-phase circuit-breaker
In case overload and short-circuited wire
connection should occur, the circuit-breaker trips.
When this is tripped, stop the unit immediately
and reset the circuit breaker after getting rid of
the causes of trouble.
<
How to reset
>
In order to reset the lever of circuit-breaker, press
hard the lever downward till the lever sounds
“click”.
4.2.3 Thermal relay
In case overload or short-circuit should occur to
load or load connection cable, this relay functions
to trip the circuit-breaker.
It is not necessary to push the reset button even
after the three phase main breaker is tripped since
the thermal relay is set automatic return at
factory.
A030403E
A080514
Reset button
Thermal relay
A100409
Discount-Equipment.com
Содержание SDG40S-8B1
Страница 1: ... www discount equipment com D i s c o u n t E q u i p m e n t c o m ...
Страница 62: ...8 Specifications 8 3 8 2 Outline drawing Unit in A100399 D i s c o u n t E q u i p m e n t c o m ...
Страница 63: ...8 Specifications 8 4 Unit mm A100398 D i s c o u n t E q u i p m e n t c o m ...
Страница 64: ...9 Wiring Diagram 9 1 9 1 Generator Wiring Diagram A100400 D i s c o u n t E q u i p m e n t c o m ...
Страница 65: ...9 Wiring Diagram 9 2 9 2 Engine Wiring Diagram SDG40S 8B1 A100426 D i s c o u n t E q u i p m e n t c o m ...
Страница 66: ...D i s c o u n t E q u i p m e n t c o m ...
Страница 67: ...10 Piping Diagram 10 1 10 1 Fuel piping A100427E D i s c o u n t E q u i p m e n t c o m ...