6
Step 4
Replace the front panel onto the server.
Step 5
Plug an Ethernet cable to the LAN port located on the rear panel, and then connect it
to your switch or router.
Step 6
Plug the AC power adapter to the power connector located on the rear panel, and
connect it to a power outlet.
Step 7
Press the power button to turn on the 2-Bay NAS.
Verify the
Power, HDD and LAN are lit
. The HDD LED only lit up when the hard drive is properly
installed.
Congratulations! The hard drive installation is complete!