Chiller Technical Manual 7752785 V1.12.0_10_2018
Maintenance
Electrical Inspection
Procedures
Electrical Connections
Ensure all electrical connections are tight and correctly terminated.
Electrical Earthing
Check that the unit is correctly earthed.
Voltage
Measure the voltage at the following points and record on the maintenance sheet:
●
Voltage at Isolator
●
Voltage at permanent supply
●
Control voltage at transformer (min 22.5V, max 25V)
The voltage measurements should be carried out with the unit MCB’s turned off.
EC Fan Interrogation
The EC fans can be interrogated by connecting a hardware interface kit from the fan to a PC. The kit comprises of a
USB to RS232 9-pin “D-type” adapter. This should be installed on the PC with the software supplied with the kit.
The “COM” port of the USB to RS232 adapter should be assigned to a free COM port between COM 1 and 4 via the
system device manager.
Connect the RS232 to RS485 interface converter to the USB port of your PC via the USB to RS232 serial interface lead
and connect the RS485 output to the fan.
Tx += RS A
Tx - = RS B
(Except high airflow fans. Interogation is via a separate module available from Airedale)
Task
Frequency
Electrical
Inspection
3 Mths
12 Mths
60 Mths
Check mains power supply voltages
●
Check electrical terminals are tight.
●
Check for signs of hot spots/ discolouration on power cables.
●
Check amperages are as per design.
●
Service Tools/Test Equipment
•
Voltmeter
•
Screwdrivers/Allen Keys
•
Ammeter
Safety Equipment
•
Safety Glasses/Goggles
Содержание TurboChill TCC11R04G-01
Страница 1: ...Technical Manual TurboChill 200kW to 1360kW Air Cooled TCC and FreeCool TCF Chiller R1234ze E ...
Страница 195: ...195 Chiller Technical Manual 7752785 V1 12 0_10_2018 Chillers TurboChill R1234ze Air Cooled and FreeCool ...
Страница 196: ...196 Chiller Technical Manual 7752785 V1 12 0_10_2018 Chillers TurboChill R1234ze Air Cooled and FreeCool ...