MAINTENANCE - WEEKLY
Cleaning the A/T2000 XR on a weekly, monthly, and quarterly basis is critical in maintaining
quality processor performance. We recommend the maintenance procedure outlined below
using Spray 2000 Plus and Formula 2000 Plus cleansers especially formulated for the A/T2000
XR. This suggested maintenance schedule may have to be modified if your processor requires
more frequent cleaning.
WEEKLY...Clean Rack Assemblies
CAUTION:
Turn POWER switch OFF before removing the cover, the rack assembly or
disconnecting any electrical cables.
1. SLIDE THE LATCHES OPEN
q
Unplug the processor cover electrical cable from the processor base and remove
cover. Set aside.
q
Slide the latches open.
q
Lift each rack assembly straight up, and move it directly to the side to avoid drip-
ping chemistry into the adjacent tanks.
2. CLEAN RACK ASSEMBLIES (Do not soak overnight)
q
Place the rack assemblies in a large sink; thoroughly moisten with Spray 2000 Plus
or water.
q
Clean with a soft brush or use a sponge for each rack and warm running water to
clean rollers and gears. Be sure to rotate gears while cleaning rollers.
q
Rinse each rack assembly thoroughly and allow to dry. When cleaning the gears,
a soft brush can be used to loosen and remove stubborn deposits. Do not use
soap, detergents, or abrasive cleaners. Be sure to use a separate soft bristle brush
or sponge for each rack. Color - coded sponges are supplied with each case of
Air Techniques Developer and Fixer.
3. REINSTALL RACK ASSEMBLIES
q
Slowly lower each rack into its tank. Match color - coded end plates to color coded
latches.
q
Do not splash fixer into Developer tank when installing Fixer rack.
q
Close all the latches.
4. PROCESS A CLEANING FILM
q
Turn ON the power.
q
Always process a new cleaning film after cleaning the rack assemblies (at NOR-
MAL SPEED), after READY light illuminates.
Содержание A/T2000 XR
Страница 1: ...AUTOMATIC FILM PROCESSOR SERVICE MANUAL...
Страница 20: ...20 SYSTEM SCHEMATIC...
Страница 40: ...40 BASE ASSEMBLY TOP VIEW OVERHEAD VIEW DETAIL A BASE ASSEMBLY 45200...
Страница 42: ...42 BASE ASSEMBLY BOTTOM VIEW SINGLE FUSE CONFIGURATION 5A...
Страница 49: ...49 ROLLER TRANSPORTS WASH DRY TRANSPORT P N5510 DEVELOPER TRANSPORT P N45500 FIXER TRANSPORT P N 45505...