MN-391
7
LoadLifter 5000
fig. 5
NOTE
6. Center punch and drill one 3/8” locator hole through the frame at one bolt location and
install one 1.5” washerhead frame bolt, over-sized washer, and lock nut.
7. Check the alignment of the upper and lower bracket once again to be sure that the
distances between points X and points Y are equal and between 5 and 7 inches. Center
punch and drill one more 3/8” hole on the opposite side, install one 1.5” washerhead
frame bolt, over-sized washer and lock nut.
8. Remove the clamps and drill the remaining two holes. Install the remaining hardware
and tighten all nuts to 20 lb.-ft.
9. Using the slots in the upper bracket, align the air springs both inboard and outboard.
Tighten the air springs to the brackets to 20 lb.-ft.
10.Repeat the procedure for the other side of the vehicle.
INSTALLING THE AIR LINES
When installing the air lines, there must be at least six inches of clearance between the air
lines and any heat sources.
1. Insert a length of air line into the open port at the top of the air spring. Use Figure 9 as
an air line routing guide.
Good Cut
Air Line Cutting
Poor Cut
Option 1
Option 2
fig. 9