![ahlmann AL 65 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/ahlmann/al-65/al-65_operating-instructions-manual_2870484016.webp)
1-8
K65C/K75C/K95C
1-8
K65C/K75C/K95C
1.5.1.20
Should the driver’s sight
of his driving and working area be
restricted due to work-induced
influences, he must be given
guidance or he must safeguard the
working area by a firm barrier.
1.5.1.21
The person giving
guidance must be a reliable person
and must be informed about his
tasks before commencement of
the work.
1.5.1.22
The driver and guide must
agree on signals for commu-
nication. These signals may only
be given by the driver and guide.
1.5.1.23
The guide must be easily
recognizable e.g. by wearing
warning clothing and must always
be in the driver’s field of vision.
1.5.1.24
When passing subways,
bridges, tunnels, electrical over-
head lines make sure that there is
adequate clearance!
1.5.1.25
Keep good clearance
when working at the edge of
quarries, pits, rubbish dumps and
embankments to eliminate any
danger of the machine plunging
down. The contractor or his deputy
must stipulate the distance from
the edge taking the soil bearing
capacity into consideration.
1.5.1.26
The machine may only
be used at stationary dumping areas
when firmly integrated installation
are provided to prevent the machine
from running or sliding down.
1.5.1.20
Should the driver’s sight
of his driving and working area be
restricted due to work-induced
influences, he must be given
guidance or he must safeguard the
working area by a firm barrier.
1.5.1.21
The person giving
guidance must be a reliable person
and must be informed about his
tasks before commencement of
the work.
1.5.1.22
The driver and guide must
agree on signals for commu-
nication. These signals may only
be given by the driver and guide.
1.5.1.23
The guide must be easily
recognizable e.g. by wearing
warning clothing and must always
be in the driver’s field of vision.
1.5.1.24
When passing subways,
bridges, tunnels, electrical over-
head lines make sure that there is
adequate clearance!
1.5.1.25
Keep good clearance
when working at the edge of
quarries, pits, rubbish dumps and
embankments to eliminate any
danger of the machine plunging
down. The contractor or his deputy
must stipulate the distance from
the edge taking the soil bearing
capacity into consideration.
1.5.1.26
The machine may only
be used at stationary dumping areas
when firmly integrated installation
are provided to prevent the machine
from running or sliding down.
Содержание AL 65
Страница 8: ...Safety regulations...
Страница 29: ...Signs...
Страница 38: ...Technical data...
Страница 60: ...Description...
Страница 72: ...Operation...
Страница 83: ...Attachments...
Страница 91: ...Rescue towing lashing lifting by crane...
Страница 100: ...Maintenance...
Страница 120: ...Malfunctions causes and remedies...
Страница 123: ...Protection against theft...
Страница 126: ...Appendices...
Страница 127: ......
Страница 128: ......
Страница 131: ......
Страница 133: ...K65C K75C K95C K65C K75C K95C A 11 3 Muster Pr fhinweise f r Schaufellader A 11 3 Muster Pr fhinweise f r Schaufellader...
Страница 134: ...K65C K75C K95C K65C K75C K95C B B...
Страница 135: ...K65C K75C K95C K65C K75C K95C C C...
Страница 136: ...K65C K75C K95C K65C K75C K95C D D...
Страница 137: ...K65C K75C K95C K65C K75C K95C E E...
Страница 138: ...K65C K75C K95C K65C K75C K95C F F...