Appendix B Verification and Calibration
158
Series N6700 User’s Guide
Step 36.
Measure the current with the
Agilent 3458A and enter the value.
Front Panel:
SCPI Command:
Select the Measured Data field. Enter
the data from the external DVM.
Press Select when done.
Press Next to finish calibration.
CAL:DATA <data>
Peak Current Limit Calibration
Steps 37 through 41 only apply to Agilent Models N6751A, N6752A,
N6761A and N6762A.
Step 37.
Connect the 25 ohm load resistor across the output terminals (see
the equipment list).
Step 38.
Select peak current limit calibration.
Front Panel:
SCPI Command:
Select
System\Admin\Cal\Function\IPeak
.
CAL:CURR:PEAK
(@1)
Step 39.
Select the first current calibration point.
Front Panel:
SCPI Command:
Select Next. The calibration is
automatic.
CAL:LEV P1
*OPC?
Step 40.
Replace the 25 ohm resistor with the 4 ohm load resistor (see
equipment list).
Step 41.
Select the second current calibration point.
Front Panel:
SCPI Command:
Select Next. The calibration is
automatic.
CAL:LEV P2
*OPC?
Steps 42 through 44 apply to Agilent Models N6731A through
N6735A, and N6742A through N6745A.
Step 42.
Connect the 4 ohm load resistor across the output terminals (see the
equipment list).
Step 43.
Select peak current limit calibration.
Front Panel:
SCPI Command:
Select
System\Admin\Cal\Function\IPeak
.
CAL:CURR:PEAK
(@1)
Содержание N6700B
Страница 1: ...A A A A Agilent Technologies Modular Power System Series N6700 User s Guide...
Страница 28: ......
Страница 160: ......
Страница 168: ......
Страница 181: ...Service Appendix D Series N6700 User s Guide 181 2 3 4 1 COMMON COMMON N6700B BIAS BOARD A4 N6700A CARRIER BOARD A4...