![Agilent Technologies N5230AU-974 Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/agilent-technologies/n5230au-974/n5230au-974_installation-note_2868706029.webp)
Installation Note N5230-90022 29
Step 15. Perform Post-Upgrade Adjustments
Adjustments
The following adjustments must be made due to the hardware changes of the analyzer.
• LO power
• source calibration
• receiver calibration
These adjustments are described in the PNA service guide and in the PNA on-line HELP. A
list of equipment required to perform these adjustments can be found at
Required for Post-Upgrade Adjustments” on page 6
Calibration
The analyzer should now operate and phase lock over its entire frequency range.
If you experience difficulty with the basic functioning of the analyzer, contact Agilent. Refer to
“Getting Assistance from Agilent” on page 3
• Although the analyzer functions, its performance relative to its specifications has not been
verified.
• It is recommended that a full instrument calibration be performed using the N2721A
performance test software.
• Refer to the analyzer’s service guide for information on the performance test software.
Содержание N5230AU-974
Страница 13: ...Installation Note N5230 90022 13 Figure 8 20 GHz Top to Bottom Cables Removal Top...
Страница 15: ...Installation Note N5230 90022 15 Figure 9 20 GHz Components Removal...
Страница 17: ...Installation Note N5230 90022 17 Figure 10 50 GHz Components Installation...
Страница 19: ...Installation Note N5230 90022 19 Figure 12 50 GHz Top to Bottom Cables Installation Top...
Страница 23: ...Installation Note N5230 90022 23 Figure 15 50 GHz Bottom Cables Installation...
Страница 30: ...30 Installation Note N5230 90022...