![Agilent Technologies N5230AU-974 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/agilent-technologies/n5230au-974/n5230au-974_installation-note_2868706018.webp)
18
Installation Note N5230-90022
Step 8. Install the 50 GHz Top to Bottom Cables
1. Place the analyzer on its side as shown in
. New parts are listed in
.
2. Insert cables W3 and W6 into the analyzer in the direction indicated by the arrows. It may
be necessary to guide the other end of the cables, on the top side of the analyzer, as they
are being inserted.
3. Loosely connect cables W3 and W6 at the locations shown in
. Once
all connectors are loosely connected, tighten the connectors.
Figure 11 50 GHz Top to Bottom Cables Installation, Bottom
Содержание N5230AU-974
Страница 13: ...Installation Note N5230 90022 13 Figure 8 20 GHz Top to Bottom Cables Removal Top...
Страница 15: ...Installation Note N5230 90022 15 Figure 9 20 GHz Components Removal...
Страница 17: ...Installation Note N5230 90022 17 Figure 10 50 GHz Components Installation...
Страница 19: ...Installation Note N5230 90022 19 Figure 12 50 GHz Top to Bottom Cables Installation Top...
Страница 23: ...Installation Note N5230 90022 23 Figure 15 50 GHz Bottom Cables Installation...
Страница 30: ...30 Installation Note N5230 90022...