
8
Installation
User Guide
93
shows the default GC column assignments for column modules connected to each
board. (If the boards are configured differently than shown, the assignments change
accordingly.)
Figure 47.
GC column assignments by electronics board position
Check for leaks
The CFT fittings are generally leak-free once installed. If properly swaged, and if swaged and
installed to the recommended tightness, these fittings can be thermally cycled, removed, and
reinstalled many times without leaking. However, always check for leaks after making
changes.
Turn on the GC inlet pressure. If the inlet does not hold pressure, check the connection
between the GC column module and the CFT union first. Use an electronics leak checker to
check for leaks at the new column connections.
GC column 1
GC column 2
GC column 3
GC column 4
Board configured as:
LTMII Col1 & Col2
(Closest to GC)
Board configured as:
LTMII Col3 & Col4
(Front board, optional)
Содержание LTM II Series
Страница 1: ...Agilent LTM Series II Rapid Heating Cooling System for Agilent 8890 GCs User Guide ...
Страница 6: ...6 User Guide ...
Страница 14: ...1 Introduction 14 User Guide ...
Страница 64: ...4 Operation 64 User Guide ...
Страница 72: ...5 Troubleshooting 72 User Guide ...