Chapter 3
25
Operation Verification
Power On the Signal Generator
Power On the Signal Generator
This procedure verifies that the signal generator powers up and that the internal instrument check identifies
no errors. The internal check evaluates operation and, if a problem is detected, returns an error message.
1. Power on the signal generator by pressing the front panel power switch. The green LED will light once
power is activated. Let the signal generator warm up for one hour.
NOTE
For ESG signal generators with Option UNJ, or those with Option 1E5,
ERROR 514,
Reference Oven Cold
occurs whenever the signal generator is first connected to ac line
power. The
OVEN COLD
annunciator and the
ERR
annunciator both turn on. The
OVEN COLD
annunciator automatically clears after approximately 5 minutes. The error
queue
cannot
be cleared, however, until the
OVEN COLD
annunciator has turned off.
2. Cycle the power to the signal generator. The green LED should again be lit and the signal generator will
perform a check.
Содержание E4428C ESG
Страница 7: ...1 1 Safety Information ...
Страница 12: ...6 Chapter 1 Safety Information General Safety Considerations ...
Страница 13: ...7 2 Getting Started ...
Страница 28: ...22 Chapter 2 Getting Started Contacting Agilent Sales and Service Offices ...
Страница 29: ...23 3 Operation Verification ...
Страница 61: ...55 4 Regulatory Information ...
Страница 64: ...58 Chapter 4 Regulatory Information Regulatory Information misc ...