8-33
Instrument BASIC
Programming and Using the TESTS Subsystem
5
Select the Yes/No field and decide if the test is to be run on all channels (select
Yes), or if the test is to be run on prime channels only (select No). (Prime
channels are selected from the Edit Freq field.)
Four factors determine how long it takes to test a radio:
•
The number of tests selected in the sequence.
•
The kind of tests that are selected.
•
The order in which the tests are selected.
•
The number of points measured in a test. (This is determined by the start, stop,
and step values in certain test parameters.)
Tests can be selected in any order; but to reduce testing time, you should
strategically organize the test sequence. Tests requiring operator intervention
(changing volume, channels, and so forth) should be grouped together.
Figure 8-14
Test-Sequence Screen
Editing Test Specifications
Test Specifications are the upper and lower limit values that are used by the Test
Executive to describe the manufactured specifications of the radio itself. For a radio
to pass a test, the measured value must fall within the test’s specified value (lower
limit, upper limit, or both upper and lower limits).
1
and select the field
Test Function
at the bottom of the screen.
2
From the list of
Choices
in the revealed box, select
Edit Seqn
and edit the
3
1
6
5
4
2
TESTS
Содержание 8922M
Страница 8: ...Contents Contents 6...
Страница 21: ...1 1 1 Installing Your Agilent 8922M S...
Страница 24: ...1 4 Installing Your Agilent 8922M S Fuses and Power Cords Power Cords Agilent Part Agilent...
Страница 29: ...2 1 2 Making Measurements...
Страница 59: ...2 31 Making Measurements If You Have Problems with a Measurement Figure 2 16...
Страница 61: ...2 33 Making Measurements If You Have Problems with a Measurement Trigger Range For Pulsed RF...
Страница 75: ...2 47 Making Measurements Advanced Features...
Страница 76: ...3 1 3 Verifying Performance...
Страница 106: ...3 31 Verifying Performance Agilent Technologies 8922M S Specifications...
Страница 224: ...4 118 Screens Service Service This screen is documented in the service documentation To escape press PREV...
Страница 235: ...4 129 Screens Tests Tests Instrument BASIC Refer to chapter 8 Instrument BASIC for information about the Tests Screen...
Страница 236: ...4 130 Screens Tests...
Страница 237: ...5 1 5 Keys...
Страница 238: ...5 2 Keys Key Map Key Map...
Страница 275: ...6 27 Connectors Timing Diagrams Timing Diagrams Figure 6 2 Digital Demodulation Timing Specification Table...
Страница 276: ...6 28 Connectors Timing Diagrams Figure 6 3 Digital Demod Timing Diagram...
Страница 277: ...6 29 Connectors Timing Diagrams Figure 6 4 Frequency Hop Timing Specification Table...
Страница 278: ...6 30 Connectors Timing Diagrams Figure 6 5 RF Generator Hop Address Source Ext Timing Diagram...
Страница 279: ...6 31 Connectors Timing Diagrams Figure 6 6 RF Analyzer Hop Address Source Ext Timing Diagram...
Страница 280: ...6 32 Connectors Timing Diagrams Figure 6 7 RF Generator Hop Address Source Int Timing Diagram...
Страница 281: ...6 33 Connectors Timing Diagrams Figure 6 8 RF Analyzer Hop Address Int Timing Diagram...
Страница 282: ...6 34 Connectors Timing Diagrams Figure 6 9 Reset Hop Once Address Source Int Timing Diagram...
Страница 283: ...6 35 Connectors Timing Diagrams Figure 6 10 Reset and Hold Hop Address Source Int Timing Diagram...
Страница 284: ...6 36 Connectors Timing Diagrams Figure 6 11 Hop Inhibit Address Source Int Timing Diagram...
Страница 297: ...8 1 8 Instrument BASIC...
Страница 341: ...A 1 A APPENDIX A...
Страница 364: ...A 24 APPENDIX A Protocol Log of a Typical Call...
Страница 365: ...B 1 B Glossary...
Страница 370: ...B 6 Glossary...