50
P1512115 R8
Figure 30.
S-Drive Roller Bolts and Pipes
Item
Description
1
Take-up Roller Bolt
2
Pinch Roller Bolt
3
Pinch Pipe
4
Spring
5
Take-up Pipe
The belt will require final tension and alignment after the conveyor is fully assembled.
4.15. Install the Weather Guard Mount Bar
This procedure describes how to install the mount bar assemblies on the weather guard.
For component identification and placement refer to:
•
•
•
1. Install each mount bar assembly on the weather guard sections:
•
The type of mount bar assemblies to install along the weather guard are indicated by the letters shown
in the figure following the table below.
•
Details showing each mount bar assembly is indicated in the figure below.
2. Adjust the position on all weather guards and mount bars to achieve the best fit.
3. Tighten all nuts.
PORTABLE GRAIN BELT CONVEYOR – FIELD LOADER