![AGI 1549 Скачать руководство пользователя страница 93](http://html1.mh-extra.com/html/agi/1549/1549_assembly-manual_2866987093.webp)
8210-10003 R0
93
5. Loop the cable (1) around the 5/16" x 1" bolt and secure with 1/8" cable clamp (2). Ensure trailing cable end
is kept short.
6. Tighten the bolt on the P-clip once the cable is in place.
7. Test the function of the collapsible hopper cloth controls by raising and lowering the handle. Adjust cable
tension as required.
Attaching the Cable to the Hopper Frame
1
2
5
6
7
8
(Put a 2nd washer
on the backside of
hopper cloth)
1
1/8" Cable 7x19 GAC
6
5/16" x 1" Bolt (GR8)
2
1/8" Cable Clamp
7
5/16" Nylon Lock Nut (GR8)
5
1-1/4" P-Clip
8
5/16" Flat Washer
Hardware Kit: HRDW-15-82
UCX3 S-DRIVE FIELD LOADER – PORTABLE GRAIN BELT CONVEYOR