![AGI 1549 Скачать руководство пользователя страница 110](http://html1.mh-extra.com/html/agi/1549/1549_assembly-manual_2866987110.webp)
110
8210-10003 R0
3.40. Connect the Gas Drive Control Box Wiring
Important
•
Consult the OEM (original equipment manufacturers) manual to make all required electrical
connections.
•
Before you begin wiring, make sure to take the key out of the control box.
Control Box Wiring Connections
ON
AGI
OFF
LIGHTS
CHECK
ENGINE
CLU
O
ON
2
1
3
4
1
Tachometer Ground Wire
3
Lighting Harness Cable
2
Clutch Cable
4
Engine Harness Cable
UCX3 S-DRIVE FIELD LOADER – PORTABLE GRAIN BELT CONVEYOR