8210-10003 R0
43
Setting the Belt Tension
Welded Nut
Pretensioner Pipe
2. Measure to be sure both sides are set at the same position.
3. Tighten the pinch roller bolts (2, both sides of S-drive) until the head of bolt contacts the pinch pipe (3).
4. Check to make sure the bolts on the pinch roller bearings are just loose enough to allow the pinch roller to
kick back 1/4" during operation (when the belt seam passes through).
5. Re-attach the S-drive bottom guards.
The belt will require final tension and alignment after the conveyor is fully assembled. Refer to the conveyor
operation manual for complete instructions.
UCX3 S-DRIVE FIELD LOADER – PORTABLE GRAIN BELT CONVEYOR