8210-10003 R0
25
3.9. Install the U-Trough Covers
Install the two U-trough covers near the spout at this time. Install the remaining two covers later after aligning
and tracking the belt.
1
10' U-Trough Cover
4
7/16" Hex Flange Nut UNC Serr (GR5) ZN
2
Track Section Cover
5
1/4" x 3/4" Hex Flanged Bolt Serr (GR5)
3
7/16" x 1" Hex Flanged Bolt Serr (GR5) ZN
6
1/4"-20 Thread Insert Swage Style
1
2
1
1
4
1
3
2
6
5
UCX3 S-DRIVE FIELD LOADER – PORTABLE GRAIN BELT CONVEYOR