Checklist
d-lab.2, d-lab.2plus, netlab.2plus: Preinstallation
18
2005-05-01 / PN 04100_01
AgfaPhoto
6.3 Supply
Facilities
Yes No
Illumination
Maximum light intensity of 10,000 Lux is not exceeded?
Production area is sufficiently illuminated for evaluation of the printed production?
(day light fluorescent light)
Machine is not exposed to direct sunlight at the operation site?
Remarks: ______________________________________________________________________
______________________________________________________________________________
Space requirements for operation and service
Enough space available around the machine for operation and service
(at least. 4.90 m x 1.82 m – see
drawing
and
Required Space for Operation, Maintenance, and
Service
)?
320 cm
60 cm
110 cm
77 cm
15 cm
87 cm
90 cm
A
B
G_GG129
A Hot air extraction (for laser exhaust = 220 m³/h
(only machines with Gaslaser: d-lab.2 Type 8060/260, d-lab.2plus Type 8060/261)
B Power
connection
Ceiling height meets the requirements (at least 2.15 m)?
Darkroom or dark tent present?
Remarks: __________________________________________________________________
______________________________________________________________________________