Checklist
d-lab.2, d-lab.2plus, netlab.2plus: Preinstallation
20
2005-05-01 / PN 04100_01
AgfaPhoto
Yes No
Water supply
Customer wants a direct water connection to the machine?
Order the water connection kit (optional accessory) before the installation!
Water connection for chemical mixing and for cleaning or maintenance work available?
Distance to the machine: ________
Cleaning sink available near the machine?
Remarks: __________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
Power connection
The customer is familiar with requirements and ensures that all preparations are made prior to the
installation (supply cable must be installed all the way to the machine; connection position: see
B, drawing in section
Supply Facilities
)?
Configuration: _____________________
Remarks: __________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
Telephone
connection
The customer is familiar with the requirements and makes sure that the respective work is
completed prior to the installation?
Remarks: __________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
Network
connection
The customer is familiar with the requirements and makes sure that the respective work is
completed prior to the installation?
Remarks: __________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
6.4 Training
Yes No
Training
Necessary training has been discussed with the customer?