8
3.2.6 EPS
When the grid is suddenly off or abnormal, inverter will change to off grid status automatically.
Energy from PV system and battery will supply the local load.
4.Installation
4.1 Pre-installation
Check the equipment before installation to make sure whether the packaging and components
are lost or damaged, if it is, please contact local distributor directly for support.
4.1.1 Packing List
Please ensure the following items are included in the packaging with your machine.
Содержание AF3.6K-DH
Страница 14: ...13 4 2 Mounting ...
Страница 17: ...16 Lithium ...
Страница 19: ...18 ...
Страница 22: ...21 Pin BAT NCT CAN 1 TEP T 2 TEP G 3 CAN H 4 CAN L ...
Страница 27: ...26 EPS Connection Generator Connection ...
Страница 49: ...48 8 Specifications Hybrid Inverter ...
Страница 50: ...49 ...
Страница 51: ...50 ...
Страница 52: ...Building 7 No 333 Wanfang Rd Minhang District Shanghai China 201112 Version HH1004 01 ...