Operation 15
4510003 Rev B
Operation
Startup
1. Before starting the ES-200A Heat Tunnel, double-check the installation.
2. Verity that all power cables are properly connected.
3. Turn the Heat Tunnel Power Switch located on the front of the Control Cabinet to the
ON position.
4. Turn the conveyor power switch to the ON position.
Heat Tunnel
Power Switch
Conveyor Power Switch