14 Installation and Setup
4510003 Rev B
Connecting Power
CAUTION:
Before connecting power, verify that the power switches are in the OFF
position.
Connect an appropriate electrical plug to the end of the cord.
Plug the power cords from the conveyor and tunnel into properly wired and grounded
electrical outlets.
Heat Tunnel Power Cord
Conveyor Power Cord
Conveyor Power Switch
Tunnel Power Switch
Содержание ES-200A
Страница 1: ...4510003 Rev B ES 200A Convection Heat Shrink Tunnel User Guide ...
Страница 2: ...4510003 Rev B ...
Страница 4: ...4510003 Rev B ...
Страница 25: ...Schematic Diagrams 25 4510003 Rev B Fan Inverter Setting 2 1 M FAN FAN FAN M M 1 2 3 ...
Страница 26: ...26 Schematic Diagrams 4510003 Rev B ES 200A Wiring Diagram ...
Страница 27: ...Schematic Diagrams 27 4510003 Rev B ...
Страница 28: ...28 Schematic Diagrams 4510003 Rev B ...
Страница 40: ...4510003 Rev B ...
Страница 41: ...4510003 Rev B ...
Страница 42: ...4510003 Rev B ...