Installation and Setup 13
4510003 Rev B
Tunnel Placement
A conveyor must be used with the tunnel to move the product while it is being sleeved.
1. Position the tunnel next to the conveyor, considering product size and location on
conveyor.
2. Ensure that all controls on both control panels are easily accessible.
3. Set the conveyor height.
4. If the tunnel height needs adjustment, connect the heat tunnel to AC power. Refer
to the “Connecting Power” section on page 14.
5. Press the
Ascend
or
Descend
buttons as required to raise and lower the heat
tunnel.
6. When the tunnel and conveyor have been properly positioned, unscrew the leveling
feet to keep the tunnel from moving.
Tunnel Controls
Conveyor Controls
Tunnel
Feet
Содержание ES-200A
Страница 1: ...4510003 Rev B ES 200A Convection Heat Shrink Tunnel User Guide ...
Страница 2: ...4510003 Rev B ...
Страница 4: ...4510003 Rev B ...
Страница 25: ...Schematic Diagrams 25 4510003 Rev B Fan Inverter Setting 2 1 M FAN FAN FAN M M 1 2 3 ...
Страница 26: ...26 Schematic Diagrams 4510003 Rev B ES 200A Wiring Diagram ...
Страница 27: ...Schematic Diagrams 27 4510003 Rev B ...
Страница 28: ...28 Schematic Diagrams 4510003 Rev B ...
Страница 40: ...4510003 Rev B ...
Страница 41: ...4510003 Rev B ...
Страница 42: ...4510003 Rev B ...