AfiMilk MPC
Installation Manual
49
First Time Operation
Chapter
7
First Time Operation
This chapter describes procedures that need to be carried out when starting up the meters
system the first time.
After the parlor is set up, and wires are connected, start up the system. Starting up
involves fives steps:
1.
Afimilk MPC
start-up sequence description
2.
Loading default parameter values
3.
Setting milking point ID numbers
4.
Milk Meter Calibrating procedures
5.
Setting parameters of milking functions:
Most parameters may be set via communication from the computer by remote
programming. However, in the following situations, parameters must be set at each
meter:
o
In all systems the stall number and electrode calibration parameters must be
set manually at each meter
o
Stand-alone systems, without computers – all parameters in all meters must
be set manually
Содержание MPC 3
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 6: ......
Страница 7: ......
Страница 8: ......
Страница 14: ......
Страница 22: ...Chapter 3 Operation Sequence AfiMilk MPC Installation Manual 22 Milking Sequence at Afimilk MPC...
Страница 31: ...Figure 8 Layout of Vacuum and Clean air Lines For Milk Meter Solenoids...
Страница 32: ......
Страница 64: ......
Страница 80: ......
Страница 96: ...Chapter 8 Unique Setup Configurations MPC Extender Connections Diagram...
Страница 98: ......
Страница 110: ...Chapter 11 Systems Accessories AfiMilk MPC Installation Manual 110...
Страница 113: ...AfiMilk MPC Installation Manual 113 Parts List Chapter 12...