![AeroWorks Sport Cub S2 ARF-QB Скачать руководство пользователя страница 48](http://html1.mh-extra.com/html/aeroworks/sport-cub-s2-arf-qb/sport-cub-s2-arf-qb_assembly-manual_2863268048.webp)
48
7. Use 5 minute epoxy to glue the mounting tem-
plate and stand off block together as shown. Al-
low epoxy to fully cure before moving on to the
next step.
9. Pass the engine mounting bolts through F1 as
shown below. Make sure a large fender washer
is installed to prevent the mounting bolts from
crushing F1.
6. Gather the engine mounting template and stand-
off block shown below.
.
8.
Drill through the engine mounting template and
into the stand off block as shown. Use a drill
press for best results.