A22L2-POH-02
AEROPRAKT-22L2 Pilot Operating Handbook
44
8.5.3 Propeller removal
Before dismantling the engine from the aircraft remove the propeller as follows:
- undo nuts and remove the attachment bolts;
- remove the propeller by pulling gently by its hub.
When installing the engine on the aircraft propeller should be installed in reversed order.
Disassembled propeller should be carried in a soft package.
8.5.4 Engine removal
Engine removal shall be done in the following order:
- remove the engine cowling panels;
- drain the cooling liquid and close all drain openings with plugs;
- remove the water cooler;
- drain the oil and close all drain openings with plugs;
-
remove the oil cooler;
- disconnect electrical system cables (connector is installed on the firewall);
- disconnect the throttle and choke control cables;
-
disconnect fuel lines;
- drain the fuel from the float chambers of the carburetors;
- remove the exhaust pipes and muffler;
- remove the split pins from eng
i
ne mount attachment studs;
- undo the nuts, take out the bolts and remove the engine
.
Engine installation should be performed in reversed order. After installation of the engine
install the propeller on it.
NOTE: Before wing removal empty the wing tanks!
8.5.5 Aircraft assembling
Aircraft assembling must be done in exactly reversed order. When installing the horizontal
tail it is necessary to lead the trim tab control cable first through its conduit in the stabilizer.
All hinges and fittings must be cleaned and greased before assembling the aircraft.
Содержание 484
Страница 2: ......
Страница 17: ...17 AEROPRAKT 22L2 Pilot Operating Handbook A22L2 POH 02 Fig 9...
Страница 21: ......
Страница 53: ...53 AEROPRAKT 22L2 Pilot Operating Handbook A22L2 POH 02...