
Test Set Operation
Subject to Export Control, see Cover Page for details.
2 - 1
Chapter 2 - Test Set Operation
This section contains operating instructions for manual cont rol of the Test Set.
2.1
TEST SET POWER UP
•
Ensure power is applied to the Test Set. Press the POWER button to power the
Test Set On.
•
For specified accuracy, allow the Test Set to warm up for 10 minutes.
NOTE: AFTER CYCLING POWER, WAIT AT LEAST 60 SECONDS BEFORE ESTABLISHING
COMMUNICATION OR MANUALLY OPERATING THE TEST SET TO ENSURE ADEQUATE TIME FOR
COMPLETING SYSTEM BOOT UP.
Fig. 2-1 Opening Screen
Содержание ATB-7300
Страница 17: ...General Information Subject to Export Control see Cover Page for details 1 8 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 69: ...Test Set Operation Subject to Export Control see Cover Page for details 2 52 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 79: ...Software Installed Subject to Export Control see Cover Page for details 4 2 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 81: ...Shipping Subject to Export Control see Cover Page for details 5 2 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 83: ...Storage Subject to Export Control see Cover Page for details 6 2 THIS PAGE INTENTIONALLY LEFT BLANK...