16
© Aero-Stream, LLC 2022
102822 Rev. H
Figure 17, Connecting Ballast Sections of Bio-Brush Clusters
Figure 18, Bio-Brush Clusters Connections Crimping Process
Repeat Cluster Connection for Subsequent Rows as Required
3.Once fully assembled, carefully cut and remove the packaging stretch wrap and discard. Cut a slit in
the poly wraps on the Bio-brushes about (1) inch long along the axis of each Bio-brush. Grasp the poly
sleeve opposite of the slit and tear the sleeve downward until it is completely removed from the Bio-
brush. Discard the poly sleeve. Repeat this for each Bio-brush.
Figure 19, Bio-Brush Unwrapped
Содержание AS1000-2
Страница 8: ...8 Aero Stream LLC 2022 102822 Rev H Figure 4 Picture of the AS450 2 System ...
Страница 9: ...9 Aero Stream LLC 2022 102822 Rev H Figure 5 Picture of the AS500 2 System ...
Страница 10: ...10 Aero Stream LLC 2022 102822 Rev H Figure 6 Picture of the AS600 2 System ...
Страница 11: ...11 Aero Stream LLC 2022 102822 Rev H Figure 7 Picture of the AS750 2 System ...
Страница 12: ...12 Aero Stream LLC 2022 102822 Rev H Figure 8 Picture of the AS1000 2 System ...
Страница 13: ...13 Aero Stream LLC 2022 102822 Rev H Figure 9 Picture of the AS1500 2 System ...