24. CONTROL AND FIRST
START-UP
24.1. PREPARATION FOR COMMISSIONING
Bear in mind that a free start-up service is
offered by the Aermec Technical Service
for the unit of this series, at the request of
Aermec customers or legitimate owners
and in ITALY only.
The start-up must be previously agreed on
the basis of the system implementation
times. Before the intervention of the AERMEC
After Sales Service, all the operations
(electrical and hydraulic hook ups, loading
and breather from the system) must be
completed.
Before starting the unit make sure that:
−
All the safety conditions have been
respected
−
The unity has been properly fixed to the
support base
−
The minimum technical spaces have
been observed;
−
Water connections have been
performed respecting the input and
output
−
The hydraulic system has been loaded
and vented.
−
The hydraulic circuit taps are open
−
The electrical connections have been
properly carried out;
−
The voltage is within a tolerance of 10%
of the unit nominal voltage
−
The earthing has been carried out
correctly
−
Tightening of all electrical and hydraulic
connections have been well carried
out.
−
24.2. FIRST COMMISSIONING OF THE
MACHINE
Before activating the unit:
−
Close the electric panel lid.
−
Position the door lock knife switch
of the machine on ON, turning the
handle down.
(fig3)
−
Press the key ON to start the
machine
(fig 4)
, when the access
LED appears the unit is ready for the
operation.
24.3. SEASON
CHANGEOVER
−
For each seasonal change check
that the operation conditions return
to the limit.
−
Check that the absorption current
of the compressor is less than the
maximum indicated in the technical
data table.
−
Check in the models with
three-phase supply power that the
noise level of the compressor is not
abnormal, in this case invert a phase.
−
Make sure that the voltage value
are within the prefixed limits and
that the displacements between
the three phases (three-phase
supply power) do not get above 3%.
24.3.1. Season change of the panel on
the machine
To activate the season change, just
press the indicated key in
(fig. 5)
. To
ensure that the operation is successful,
machine must be active as remote or
local.
For further information refer to the USE
manual.
24.3.2. Season change of PR3
−
Just act directly on the switch. The
machine turns off automatically
and it restarts with the selected
operation mode.
WARNING
The
fi
rst start-up has to
be carried out with the
standard settings, only at
last test vary the values of
the operation Set Point.
Before starting, power
the unit for at least 12-24
hours by positioning the
protection thermomagnetic
switch and the door lock
knife switch on ON
fi
g.1
Make sure that the control
panel is turned off until
it allows the oil heater
system the compressor
casing.
Fig.4
Fig.3
SET
C1
C2
R
L R
LED access
SET
C1
C2
R
L R
Fig.5
PR3 remote panel
45
INRLPY. 02.10 4086916_01
Содержание NRL
Страница 2: ......