8.
ACCEPTANCE OF WORKS
8.1. VISUAL INSPECTION
GENERAL
Remarks
Supply units in every main rooms (living room, bedroom) (accessibility)
At least one CO
2
or presence sensors is connected to the DXR Unit
(positioning)
Door relief vent (2 cm in the kitchen, 1 cm in every other rooms)
Exhaust units in the utility rooms (accessibility)
Supply compensation unit in the hall or in the living room
Exhaust compensation unit in the kitchen
Positioning of the exhaust compensation valve (direction shown by the arrows)
Access hatch for the exhaust compensation valve
Positioning of the defrosting in the fresh air duct (direction shown by the arrows)
Access hatch for the defrosting
DXR UNIT AND DX HUB
Remarks
Accessibility (1 access hatch for the DXR Unit and 1 access hatch for the DX Hub)
Positioning of the DXR Unit (horizontal) and fixation of the DX Hub and the
DXR Unit to the ceiling
Conformity of connection (direction shown by the arrows on the DXR Unit)
Flexible connection sleeve at the DXR Unit and airtightness of the connections
Exhaust air and fresh air duct (insulated and Ø160 mm)
ELECTRICAL DEVICE
Remarks
Supply voltage
Ground connections
RJ 12 and RJ 45 connections
Individual electrical connection for electrical device (defrosting, DXR Unit)
START
Remarks
Working of the interface
8.2. MEASUREMENTS
If some measurements are planned on the project, it is recommended to measure for acceptance of work:
·the airflow rates and pressures at the exhaust and supply units,
·the airflow rates at the fresh air intake and the used air discharge,
·possibly, the sound level in the main rooms and very close to the fans,
·check the modulation of the airflow.