MC2: 10/03/12 Page
19
of
90
GF-115-H
TAG-0083_0B
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
•
Ph: 800-526-0288
CHAPTER 3:
INSTALLATION
3.1 Introduction to Installation
The Modulex Boiler is intended to be installed as a
Category IV
vent installation and must be installed
in compliance with all applicable laws and regulations including the ones below. See
Sub-section 4.2
for category descriptions.
To ensure proper boiler installation, complete ALL instructions in
Section 3.2.
The installation must conform to the requirements of the authority having jurisdiction or, in the absence
of such requirements, to one of the following:
UNITED STATES:
Installation must conform to the requirements of the National Fuel Gas Code, ANSI
Z223.1 installation Codes.
CANADA:
Installation must conform to the requirements of CAN/CGA CSA B149.1 installation codes.
Where required by the authority having jurisdiction, the installation must conform to the Standard for
Controls and Safety Devices for Automatically Fired Boilers, ANSI/ASME CSD-1.
IMPORTANT NOTE!
Installers must follow local regulations with respect to installation of
Carbon Monoxide (CO) Detectors. Also, follow the maintenance
recommendations in this manual.
For Massachusetts Installations:
The boiler must be installed by a plumber or gas fitter licensed within the
Commonwealth of Massachusetts. For installations in buildings used for
residential purposes, if a side-wall vent termination is less than 7 feet
above grade, an NFPA 720 compliant, ANSI/UL 2034 listed and IAS
certified carbon monoxide detector must be installed on the floor level
where the boiler is installed and on each level of the building served by
the boiler.
3.2 Installation Instructions
The following information in this section provides the instructions to unpack and install the Modulex Boiler.
3.2.1 Unpacking the Boiler
The Modulex Boiler is delivered assembled and protected by a plastic bag inside a rugged
cardboard box, which is fixed on a pallet (see
Figure 3-1
). The pallet allows the boiler to be handled
by a forklift or pallet jack. The boiler, with the packaging, can fit through a doorway of 32 in. (81 cm),
whereas, without packaging, it can fit through a doorway of 28 in. (71 cm). To unpack the Modulex,
remove both straps and then the cardboard box from above. Check to ensure that the product is
intact.
The packing elements (cardboard box, straps, plastic bags, etc…)
should be kept away from small children as these pose a risk of
suffocation and/or choking.
WARNING
!
!
WARNING
!
!