Innovation Water Heaters Installation, Operation & Maintenance Manual
Page
216
of
216
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
OMM-0078_0M
09/11/2015
Phone: 800-526-0288
GF-128
International Inc.
© AERCO International, Inc., 2015
Change Log
Date
Description
Changed By
11/25/2014
Rev L PIRs:
979:
Updated
gas train 22168-1
1018
: This PIR not implemented, returned 22151 in place of 22225 in
Appendix F.
1074:
Ignitor-injector replaced direct spark, replaced gas train part drawings in
Appendix F. Added drawings for gas trains 22182-1 & 22182-4.
1075
: Replaced flame rod 66018 with 66037 (Kit P/N 24356-2)
1086
: Added new section 6.7.1, anode replacement.
934-105
: Remove last line paragraph from warranty (coverage outside the
US/Canada limited to 18 months).
934-99
: Added new section 6.11 - LWCO Cap Test Instructions.
934-113
: Updated Control Panel menu descriptions & added section 3.7 -
Calibration Menu to Chapter 3, updated Appendix A, removed default values,
removed Appendix D, (all defaults now in Chapter 3).
1092
: Removed Chapter 8 – RS232 Communication, per Firmware version 4.0
and above.
1118
: Removed vent gasket 81148, expanded section 2-13 Flue Gas Vent
Installation; use Red RTV when installing flue vent
Chris Blair
09/11/2015
Rev M:
992-1
: Replaced old style Condensate trap 20460 with new style, 24441 in
section 6.9
1011:
Changed Blocked Inlet switch pressure from -8.0 to -4.5 in Appendix A.
1109
: Replaced Burner Shield
Gasket 124749 with 81197.
1123:
Replaced Sequencing Valve 92093 with 92123
934-150:
Clarified references to and function of spark monitor (p/n 61034) (or
AC current transducer) in section 2.12.4, added new section 6.14 Spark
Monitor
934-155:
Added Installation Notes regarding WHM with ProtoNode SSD to
new section 8.8.1.
1156
: Replaced old wiring schematics 68039 & 68042 with 68056 – 68059.
DIR 218
: Updated natural gas & propane combustion calibration procedures
DIR 226:
Amended warranty to apply only to units sold in North America.
DIR 231
: Clarified blower-side intake manifold and intake manifold, added new
step 3 to section 6.6 (torque hex nuts to 146 in/lbs.), added new steps 19 and
21 to re-torque six hex nuts after 20 minute fire.
Chris Blair